demolition

Lakewood site prepped for development

Fences went up today at Lakewood’s East End around a former National Tire & Battery (NTB) store and its parking lot at the southwest corner of Detroit and Coutant avenues. In the coming days, the NTB store will come down while hydraulic lifts in the building’s vehicle repair shop will be removed and possibly some of the soil surrounding the lifts, too. Those are just some of the activities that will prepare the site for the next phase of the Studio West 117 development.

Read More

Lakewood site prepped for development Read More »

Old Brooklyn development plan wins support

Plans for redeveloping the northwest corner of Pearl Road and Memphis Avenue in the heart of Cleveland’s Old Brooklyn neighborhood were set in motion yesterday when a Pittsburgh-based architecture and development firm and its conceptual plan were selected by the Old Brooklyn Community Development Corp. (OBCDC). Desmone, OBCDC and other neighborhood stakeholders pledged to work together in the first quarter of 2023 to turn the proposal into an real project.

Read More

Old Brooklyn development plan wins support Read More »

Bridgeworks seeks options after 2nd TMUD snub

The development team that has sought to build the high-rise Bridgeworks development, 2429 West Superior Viaduct, in the Hingetown section of Ohio City is left with more questions than answers today after being left off the awards list for Ohio Transformational Mixed Use Development (TMUD) tax credits the second time. The Ohio Tax Credit Authority is making its decision on TMUD award winners and losers today, but information about other applicants was not yet available.

Read More

Bridgeworks seeks options after 2nd TMUD snub Read More »

Westinghouse plans revealed

Plans for the Westinghouse redevelopment got a lot clearer this week after NEOtrans was able to secure recent conceptual plans for the project. While a luxury boutique hotel and apartments are likely to be the highest-profile features in a pending redevelopment of the former Westinghouse plant overlooking the West Shoreway, a less sexy land use will be the plan’s bread and butter. That use is a planned warehouse for Cleveland-based McPc, a fast-growing information technology company that helps businesses manage security risks and logistical challenges.

Read More

Westinghouse plans revealed Read More »

Historic buildings to be razed in Flats

A row of buildings along Columbus Road in the Flats is due to be razed in the coming weeks by an active, local real estate developer. But there is no plan to replace buildings, including two from the 19th century that stand in a nationally registered historic district. Instead, according to a partner at the property’s owner, Integrity Realty Group (IRG) of Beachwood, the contiguous buildings would be demolished to keep them from falling down on innocent passersby. No structural analysis was included in the owner’s demolition requests to the city.

Read More

Historic buildings to be razed in Flats Read More »

First look at Cleveland Clinic’s largest-ever building

In several days, the City Planning Commission’s Design Review Committee will get its first chance to offer its opinion on what will be the Cleveland Clinic’s largest-ever building. The facility will be the new home of the Clinic’s Neurological Institute — a 1-million-square-foot structure that will tower over Carnegie Avenue, between East 89th and 90th streets. It is the current site of the eight-story P Building surgery center that is now is the process of being demolished.

Read More

First look at Cleveland Clinic’s largest-ever building Read More »

MetroHealth starts West 25th development work

MetroHealth System, developer NRP Group and RDL Architects Inc. have begun conversations with the City Planning Commission on the early stages of advancing the development of two large buildings on the west side of West 25th Street, across from the hospital’s main campus. The two buildings, to be located in Cleveland’s Clark-Fulton neighborhood, would provide market-rate apartments and affordable units for seniors, plus a new police station and ground-floor commercial uses along West 25th’s sidewalk.

Read More

MetroHealth starts West 25th development work Read More »

Half of ex-Westinghouse plant to be razed

Planning documents submitted to the city yesterday reveal that slightly more than half of the former Westinghouse plant overlooking the West Shoreway and Lake Erie could be demolished in preparation for the redevelopment of the surviving structures. According to sources familiar with the project, the surviving portions at the plant at 1200 W. 58th St. in Cleveland are proposed to be redeveloped as a boutique hotel, apartments and leasable commercial spaces plus parking.

Read More

Half of ex-Westinghouse plant to be razed Read More »

The future of the Cleveland Play House site

Planning and development activities by several large players are pointing toward the need for constructing thousands of housing units in and near the Cleveland Clinic and the nearby booming University Circle area. And while the large number of housing units already under construction in and near University Circle is evident, it’s likely that they will start rising west of the Clinic’s main campus soon.

Read More

The future of the Cleveland Play House site Read More »

Scroll to Top